Prototypes delivered

Predictive maintenance

The seventh project carried out by the Computer Engineering students was the development of a project based on a predictive maintenance system, with the aim of presenting innovative solutions to the project partners through the use of technology.

blue logo

PROBLEM: Improving the aircraft maintenance process by implementing the predictive maintenance model.

OBJECTIVE: To reduce the fuel consumption of Embraer E2 aircraft through predictive maintenance.

PUBLIC: Azul maintenance team

LINK: https://github.com/2023M7T2-Inteli

2024 - 3rd Quarter

wolks logo

PROBLEM: Classification of possible vehicle failures.

OBJECTIVE: To provide a classification of possible faults that may be presented in the vehicle.

PUBLIC: Quality team

LINK: https://github.com/InteliProjects/2024-2A-T08-EC07